Teras Offshore to install turbines at offshore wind farm in Taiwan | 全台露營資訊
2020年12月8日—TerasOffshorehaswonacontracttotransportandinstallwindturbinesatthe319.5MWTaipowerOffshoreWindProjectPhaseII,inTaiwan.
The offshore wind farm which is expected to begin operations in 2025, will be located about 14.7km offshore in Changhua County
Teras Offshore, a subsidiary of Ezion, has won a $83m contract from Foxwell Energy to transport and install wind turbines at the 300MW Taipower Offshore Wind Project Phase II in Taiwan.
Foxwell Energy, an affiliate of Shinfox, had won the tender from Taiwan Power for the development of the Taipower Offshore Wind Project Phase II at a total contract cost of $2.11bn (NT$62.89bn). Shinfox is the renewable energy arm of Cheng Uei Precision Industry.
As per the terms of the contract, Teras Offshore will provide wind turbine installation vessels and will transport and install the 31 offshore wind turbines.
特瑞斯海事技術服務股份有限公司【徵才職缺簡介】104人力銀行 | 全台露營資訊
「TERAS OFFSHORE」找工作職缺-2021年7月 | 全台露營資訊
Teras Offshore to install turbines at offshore wind farm in Taiwan | 全台露營資訊
廣錠打造國產化艦隊、延攬葉片商天力總座!搶進離岸風電海事 ... | 全台露營資訊
國內產業 | 全台露營資訊
台電離岸風場正崴集團標下 | 全台露營資訊
Teras Offshore Broadens Its Work Scope for Taipower Phase II ... | 全台露營資訊
Teras Offshore Inks EUR 69 Million Contract for Taipower ... | 全台露營資訊
Teras Marine works with K2M for offshore wind farm ... | 全台露營資訊
廣錠旗下特瑞斯攜手K2M 推進台電二期離岸風場在地化 | 全台露營資訊
客家委員會客家文化發展中心六堆園區二期用地是合法露營區嗎?屏東縣露營區
你是否要去屏東縣露營呢?客家委員會客家文化發展中心六堆園區二期用地是合法的露營區嗎?符合土地使用管制 縣市類別:屏...